Export/Import limitation parameters

An installer can set export/import limitation parameters according to user needs when creating new systems.
To modify parameters after creating new systems, please manually set export/import limitation parameters according to local laws and regulations and grid agreements.
Before setting the export/import limitation parameters, ensure that the meter or Gateway is connected to the system wiring.
The parameter display may differ depending on the device model. The actual screen display shall prevail.

1
Export Limitation
When set to , the grid connection point is allowed to output power.
2
Maximum Power Export Limitation
Set the maximum power value output by the grid connection point.
3
Maximum Power Import Limitation
When set to , the grid connection point is allowed to input power.
4
Maximum Power Import Limitation
Set the maximum power value input by the grid connection point.
5
Grid Connection Point Power Control Method
Total Power: The grid connection point is controlled according to the total three-phase power, meaning the sum of the three-phase power cannot exceed the Maximum Power Export Limitation and Maximum Reverse Charging Power.
Power Per Phase: The grid connection point is controlled independently for each phase, that is, the power of each phase cannot exceed 1/3 of the Maximum Power Export Limitation and 1/3 of the Maximum Reverse Charging Power.