Third-party inverter

Method 1: Connecting using Gateway

Only third-party inverters that not support off-grid functionality are allowed to connect.
Before connecting to a third-party inverter, ensure that the third-party inverter is connected to the smart load circuit breaker of the Gateway. For connection details, refer to the Installation Guide of the respective product.
On the "Device" screen, set related parameters based on the third-party inverter. Then, you can check detailed settings on the "Device" screen.
Method 2: Connecting using an electric meter

Before connecting to a third-party inverter, make sure that:
The third-party inverter is properly connected to an electric meter which is purchased from our company.
The electric meter is properly connected to the COM port of our inverter. For connection ports, please refer to the respective Installation Guide.
Diagram of third-party inverter wiring connections


The diagram displays the connections among different cables of equipment. The specific ports shall be determined by actual equipment.
On the "Device" screen, set related parameters based on the third-party inverter and the connected meter. Then, you can check detailed settings on the "Device" screen.
In the off grid state, when the operating power of the third-party inverter is ≤ (load usage power + Sigen inverter charging power), the third-party inverter can operate normally.
In the off grid state, when the operating power of the third-party inverter is greater than (load usage power + Sigen inverter charging power), the third-party inverter will stop running.
Last updated
Was this helpful?